Friday, December 20, 2013

Arrival of the palazzo



Yesterday was a red-letter day. My retirement home arrived on site. This portion was manufactured on an assembly line indoors where quality control is considerably better than it would have been if it had been built on site. Yes, it is a "stick-built" structure.


Conceptual Sketch

Factory Delivery to the site


The structure is set on the site "sideways". This profile shows the main entrance area. The car port and RV port will be placed at right angles to this profile. (refer to the sketch).

Positioned; but not in it's final location

No comments:

Post a Comment